Skip to content
Safirst Corporation
    • Overview
    • OSHA compliance
    • CPR & first aid
    • Fire safety
  • Safirst ONE
    • Blog
    • Toolbox talks
    • Free resources
    • Safety orientation (English)
    • Safety orientation (Spanish)
  • About us
EN|ES
(602) 373-0393
Free safety assessment
  • Safirst Consulting
    • Overview
    • OSHA compliance
    • CPR & first aid
    • Fire safety
  • Safirst ONE
  • Resources
    • Blog
    • Toolbox talks
    • Free resources
    • Safety orientation (English)
    • Safety orientation (Spanish)
  • About us
EN|ES
Free safety assessment(602) 373-0393
  1. Home/
  2. Newsletter/
  3. The job ends. The ringing doesn’t.

Newsletter

The job ends. The ringing doesn’t.

Published October 14, 2026 · 3 min read

Fire extinguisher is mounted or secured — not left lying on the ground, in the back of a truck

From Brandon Glenn’s Safirst newsletter on LinkedIn.

You spend years building a career in construction. That work should pay for your future, including the years when you finally get to slow down.

Protecting your hearing today is part of protecting that future.

Tinnitus is a ringing or buzzing in the ears. Many experienced superintendents and tradespeople live with it after years around loud equipment. It can affect sleep, focus, mood, and daily life. Noise is one possible cause, though tinnitus has other causes too. NIH's tinnitus guidance

October is National Protect Your Hearing Month. I want to use this edition to challenge how we think about noise on the jobsite. NIH

The shooting range test

Think about a day at the shooting range. Before you sight in a rifle, hearing protection is part of the prep.

So why do we treat a concrete saw, a grinder, or repeated impact noise differently?

The sources differ. The need to protect ourselves is the same.

"It's only going to take a minute."

That's an easy excuse when the earplugs are back in the truck.

But exposure depends on how loud and how long. A short task can still be a big exposure. Several noisy tasks in a day add up.

NIOSH recommends a limit of 85 dBA over eight hours. Every 3 decibels louder cuts the recommended time in half. At 100 dBA, it's just 15 minutes, and the rest of the day's noise still counts. NIOSH's noise-exposure guidance

OSHA's construction rule starts at 90 dBA for eight hours. The 85 dBA figure is NIOSH's more protective recommendation. It is not the OSHA construction limit. Above OSHA's limits, employers must use feasible engineering or administrative controls first. If those aren't enough, they must provide hearing protection and run an effective hearing conservation program. 29 CFR 1926.52

My recommendation: identify hazardous noise early, and control it before crews build up exposure.

Make hearing protection work in the field

  1. Measure the exposure. Identify noisy tasks and the workers nearby. Use sound measurements and personal monitoring when needed. Task length alone can't tell you if an exposure is acceptable.
  2. Reduce the noise at the source. Consider quieter equipment, maintenance, barriers, and distance between noisy work and other crews. Earplugs should back up those controls.
  3. Have protection ready before work starts. Keep hearing protection where crews need it. Include supervisors, visitors, and anyone passing through noisy areas.
  4. Check the fit. Handing someone earplugs doesn't mean they're protected. Teach proper fit, offer options, and use fit testing to verify it. Earmuffs must seal properly when worn with other PPE.
  5. Keep communication working. Crews must still hear alarms and instructions while protected. Don't assume entertainment earbuds or noise-canceling headphones protect your hearing on the job. NIOSH's hearing-protection guidance

Take the same habits home

Wear hearing protection in the garage, around loud yard equipment, and at the range. Noise off the job counts too.

If you notice ringing, muffled hearing, or trouble following conversations, see a healthcare professional. Tinnitus has different causes, and help is available.

For experienced leaders, the example matters. When the superintendent puts on protection before entering a noisy area, everyone else follows.

This week's toolbox-talk question

"Which task are we treating as 'too quick' for hearing protection, and have we actually measured it?"

We work hard to build a future for our families. Let's protect our ability to hear the conversations, laughter, and everyday moments that make it worth enjoying.

— Brandon Glenn

A page from the library: the fall protection talk with its diagramThe cover of the Safirst Toolbox Talk Library: 87 toolbox talksFree PDF

Free download

87 toolbox talks.Ready to print.

Our whole toolbox talk library in one PDF, tied to the OSHA standard behind each talk. Print one, read it to your crew, get back to work.

  • A diagram on every talk
  • English and Spanish editions
  • Read aloud in five minutes

We'll email you the download link. You'll also get the Field Report, our weekly safety email, every Thursday. Unsubscribe anytime.

Related posts

All extension cords have ground pin intact; no damaged, frayed, or worn cords in use

Newsletter

A charging battery. A garage fire. A retirement gift destroyed.

Five charging practices for the jobsite, and one check for home

Fire extinguisher is mounted or secured — not left lying on the ground, in the back of a truck

Newsletter

The alarm sounds. Can your crew actually get out?

Six field checks that decide whether your evacuation plan works

Open paved area between wood-framed two-story homes under construction, with lumber and roof trusses staged to one side

Newsletter

When the Emergency Plan Gets Put to the Test

A 2024 hot work fire put a jobsite emergency plan to the test. What happened, and five checks to run at your next morning huddle.

Safirst Corporation
3820 W Happy Valley Rd, Ste 141-138, Glendale, AZ 85310
Serving Phoenix, Tucson, Prescott, Flagstaff, Sedona, and all of Arizona · (602) 373-0393

© 2026 Safirst Corporation. All rights reserved.

  • Privacy Policy
  • Terms