Skip to content
Safirst Corporation
    • Overview
    • OSHA compliance
    • CPR & first aid
    • Fire safety
  • Safirst ONE
    • Blog
    • Toolbox talks
    • Free resources
    • Safety orientation (English)
    • Safety orientation (Spanish)
  • About us
EN|ES
(602) 373-0393
Free safety assessment
  • Safirst Consulting
    • Overview
    • OSHA compliance
    • CPR & first aid
    • Fire safety
  • Safirst ONE
  • Resources
    • Blog
    • Toolbox talks
    • Free resources
    • Safety orientation (English)
    • Safety orientation (Spanish)
  • About us
EN|ES
Free safety assessment(602) 373-0393
  1. Home/
  2. Toolbox Talks/
  3. 811 Locating & Underground Utilities Toolbox Talk

Toolbox Talks

811 Locating & Underground Utilities Toolbox Talk

Published October 19, 2026 · 3 min read

811 Locating & Underground Utilities: diagram

A free, ready-to-run toolbox talk for construction crews. Read it aloud at your morning huddle; it takes about ten minutes. Leer en español →

OSHA standard: 29 CFR 1926.651(b) · Arizona Blue Stake law (A.R.S. Title 40)

At a glance

  • Call 811 before EVERY dig — it's free, and it's the law
  • Wait for the marks, and respect the tolerance zone
  • Hand-dig within 24 inches of any marked line
  • Hit or nick a line? Stop, clear out, call it in — even if "nothing happened"

Introduction

Under every jobsite runs a grid nobody can see: gas, electric, fiber, water, sewer. Striking one means electrocution, explosion, flooding, or knocking out service to a neighborhood — and the strike usually comes from a "quick" dig someone didn't think needed a locate. Arizona law and OSHA both require utilities to be located before excavation. Today's talk covers the 811 process and how to dig around marked lines without finding one the hard way.

Before You Dig

  • Call 811 (Arizona Blue Stake) at least two full working days before digging — every dig, including "just a couple feet down"
  • Wait for the marks AND check the ticket covers your actual dig area; an expired ticket (15 working days in AZ) gets refreshed
  • Know the colors: red = electric, yellow = gas/oil, orange = communications, blue = water, green = sewer, white = your proposed dig
  • No marks where you expected some? Don't assume clear — call and confirm before breaking ground

Digging Near Marks

  • The tolerance zone is the marked line plus 24 inches each side — inside it, hand tools or vacuum excavation only, no machine digging
  • Expose the line by hand and support it before machine work continues nearby
  • Marks are the operator's best estimate: depth is NEVER guaranteed, and lines wander
  • Private lines (site lighting, irrigation, buildings to outbuildings) are NOT on the 811 ticket — ask the owner and check as-builts

If You Hit One

  • Any contact counts — a nick in the coating of a gas line or cable jacket can fail catastrophically later; report every contact
  • Gas strike: kill ignition sources, evacuate upwind, call 911 and the utility — do NOT try to plug or crimp the line
  • Electric strike: nobody touches the machine or the trench; the operator stays put unless fire forces a hop-and-shuffle exit
  • Report to the foreman and the utility even when nothing visibly happened

Key takeaways

  • 811 before every dig, no exceptions
  • Wait for the marks; refresh expired tickets
  • Hand-dig the 24-inch tolerance zone
  • Depth is never guaranteed — expose, don't assume
  • Private lines aren't on the ticket — ask
  • Report every contact, even a nick

Run this talk with crew sign-offs

This talk is part of the Safirst ONE toolbox talk library, in English and Spanish. Your foreman picks the talk in the app, the crew signs from their own phones by scanning a QR code, and the signed record files itself in your Docs Locker. Talk to Safirst to get it for your crews.

← All toolbox talks

A page from the library: the fall protection talk with its diagramThe cover of the Safirst Toolbox Talk Library: 87 toolbox talksFree PDF

Free download

87 toolbox talks.Ready to print.

Our whole toolbox talk library in one PDF, tied to the OSHA standard behind each talk. Print one, read it to your crew, get back to work.

  • A diagram on every talk
  • English and Spanish editions
  • Read aloud in five minutes

We'll email you the download link. You'll also get the Field Report, our weekly safety email, every Thursday. Unsubscribe anytime.

Related posts

Confined Spaces: diagram

Toolbox Talks

Confined Spaces Toolbox Talk

A free, ready-to-run toolbox talk for construction crews. Read it aloud at your morning huddle; it takes about ten minutes. Leer en español → OSHA standard

Focus 4 OSHA: diagram

Toolbox Talks

Focus 4 OSHA Toolbox Talk

A free, ready-to-run toolbox talk for construction crews. Read it aloud at your morning huddle; it takes about ten minutes. Leer en español → OSHA standard

Proper Lifting Techniques: diagram

Toolbox Talks

Proper Lifting Techniques Toolbox Talk

A free, ready-to-run toolbox talk for construction crews. Read it aloud at your morning huddle; it takes about ten minutes. Leer en español → OSHA standard

Safirst Corporation
3820 W Happy Valley Rd, Ste 141-138, Glendale, AZ 85310
Serving Phoenix, Tucson, Prescott, Flagstaff, Sedona, and all of Arizona · (602) 373-0393

© 2026 Safirst Corporation. All rights reserved.

  • Privacy Policy
  • Terms